NETWizz
Well-Known Member
- Reaction score
- 1,972
I hate it when the customer gets annoying because they are nervous.
Usually they have had a bad experience in the past and now they are worried, so you agree to do your work on a Saturday...
Then the proceeding Tuesday, you get an email asking, "Just wanted to see if you could provide more detail about what you will be doing on Saturday."
My response: "Gutting the eleven year old Cisco equipment from the ABC half of the entire building on every floor every wiring closet; consolidating to fewer points of failure, optimizing the organization and cabling of patch panels, delivering GigabitEthernet to approximately 800 network ports /w Power over Etherent (PoE+) for the upcoming VoIP phone deployment and install of 30+ Wireless Access Points, connecting new switches between the wiring closets with the newer/better 50/125 micron OM4 multi-mode optical fiber with 10 Gigabit links between the switches."
Usually they have had a bad experience in the past and now they are worried, so you agree to do your work on a Saturday...
Then the proceeding Tuesday, you get an email asking, "Just wanted to see if you could provide more detail about what you will be doing on Saturday."
My response: "Gutting the eleven year old Cisco equipment from the ABC half of the entire building on every floor every wiring closet; consolidating to fewer points of failure, optimizing the organization and cabling of patch panels, delivering GigabitEthernet to approximately 800 network ports /w Power over Etherent (PoE+) for the upcoming VoIP phone deployment and install of 30+ Wireless Access Points, connecting new switches between the wiring closets with the newer/better 50/125 micron OM4 multi-mode optical fiber with 10 Gigabit links between the switches."